Online Courses (English)
This just in:

Geography

Eastern Rajasthan Canal Project

  • 19 Mar 2021
  • 5 min read

Why in News

The Chief Minister of Rajasthan has demanded the national project status for the Eastern Rajasthan Canal Project (ERCP).

  • The main advantage of a project which has received national project status is that 90% of the funding for the project will be given by the central government.
  • The estimated cost of the ERCP is around Rs. 40,000 crore.

Key Points

  • Background:
    • According to the state Water Resources Department, Rajasthan, the largest state of India with a geographical area of 342.52 lakh hectares which amount to 10.4% of the entire country, holds only 1.16% of India’s surface water and 1.72% of groundwater.
    • Among the state’s water bodies, only the Chambal river basin has surplus water but this water cannot be tapped directly because the area around the Kota barrage is designated as a crocodile sanctuary.
    • Through the help of diversion structures, interbasin water transfers, linking channels and construction of pumping main feeder channels, the ERCP aims to create a network of water channels which will cover 23.67 % area of Rajasthan along with 41.13 % population of the state.
  • About the Eastern Rajasthan Canal Project:
    • It aims to harvest surplus water available during rainy season in rivers in Southern Rajasthan such as Chambal and its tributaries, including Kunnu, Parvati, Kalisindh, and use this water in south-eastern districts of the state, where there is scarcity of water for drinking and irrigation.
    • ERCP is planned to meet drinking and industrial water needs of the southern and south eastern Rajasthan, for humans and Livestock till the year 2051.
    • It proposes to provide drinking water to 13 districts of Rajasthan and provide irrigation water for 2.8 lakh hectares of land through 26 different large and medium projects.
      • 13 districts: Jhalawar, Baran, Kota, Bundi, Sawai Madhopur, Ajmer, Tonk, Jaipur, Karauli, Alwar, Bharatpur, Dausa and Dholpur.
  • Benefits:
    • A significant area of land will get irrigation facilities.
    • It intends to improve the ground water table in the rural areas of the state.
      • Positively influencing the socio-economic conditions of the people.
    • It adds special emphasis on the Delhi Mumbai Industrial Corridor (DMIC) and envisages that sustainable water sources will enhance and help industries grow in these areas.
      • Resulting in investment and revenue.

Chambal River

  • It is one of the most pollution-free rivers of India.
  • It originates at the Singar Chouri peak in the northern slopes of the Vindhya mountains (Indore, Madhya Pradesh). From there, it flows in the North direction in Madhya Pradesh for a length of about 346 km and then follows a north-easterly direction for a length of 225 km through Rajasthan.
  • It enters U.P. and flows for about 32 km before joining the Yamuna River in Etawah District.
  • It is a rainfed river and its basin is bounded by the Vindhyan mountain ranges and the Aravallis. The Chambal and its tributaries drain the Malwa region of northwestern Madhya Pradesh.
  • The Hadauti plateau in Rajasthan occurs in the upper catchment of the Chambal River to the southeast of the Mewar Plains.
  • Tributaries: Banas, Kali Sindh, Sipra, Parbati, etc.
  • Main Power Projects/ Dam: Gandhi Sagar Dam, Rana Pratap Sagar Dam, Jawahar Sagar Dam, and Kota Barrage.
  • The National Chambal Sanctuary is located along river Chambal on the tri-junction of Rajasthan, Madhya Pradesh and Uttar Pradesh. It is known for critically endangered gharial, the red-crowned roof turtle, and the endangered Ganges river dolphin.

Source IE

SMS Alerts
 

Please login or register to view note list

close

Please login or register to list article as bookmarked

close
 

Please login or register to make your note

close

Please login or register to list article as progressed

close

Please login or register to list article as bookmarked

close